Campbell Union High School District
Prospect High School is Aedis’ first K-12 Mass Timber project. The school will be transformed with the addition of two, single story buildings and approximately 1.5 acres of site work that will seamlessly connect with the existing campus and add approximately 20,000 SF of indoor and outdoor learning areas.
The importance of nature and biophilia for student health and wellness was a major focus for this project and the designs truly reflect that commitment. A strong indoor-outdoor connection was woven into the design, and Cross Laminated Timber, a natural, renewable, sustainable, and low carbon footprint material, was used for the roof structure. It creates a warm, pleasant and biophilic space that promotes an increase in student performance as well as boosts the energy level and overall well-being of the occupants.
KEY ELEMENTS
Spacious Classrooms
Maker Spaces and Science Labs
Outdoor Collaboration Spaces for Extended Learning
COMPLETED
2023
CONSTRUCTION COST
$11,200,000
PROJECT AREA
20,114 sf