San Benito High School District
The San Benito High School District needed to replace their antiquated science classrooms. The district decided to build a 38,000 sf customized pre-engineered science and robotics building consisting of 54 science classrooms/labs. This building matches the aesthetics of the historical 1920s era main building and the campus. This two-story building consists of chemistry classrooms on the 2nd floor, and earth sciences on the first floor. Each floor has corresponding auxiliary spaces. The building also consists of a 2000 sf robotics classroom with large workspaces and a roll-up door to access additional outdoor work areas. The design features plenty of natural daylighting, energy-efficient HVAC systems, and many of the latest technologies.
KEY ELEMENTS
Customized pre-engineered science and robotics building
Historical 1920s aesthetic
Natural daylighting, energy-efficient HVAC systems
COMPLETED
2020
CONSTRUCTION COST
$16,638,339
PROJECT AREA
38,000 sf