Los Gatos-Saratoga Joint Union High School District
The design used a simple, pre-engineered structure with long spans to enclose large spaces to accommodate a variety of vocational instruction activities. Each shop was paired with an acoustically separate lecture space. The tall ceiling enables storage lofts, while clerestory windows along the center ridge flood the interior spaces with natural lighting.
KEY ELEMENTS
Coming Soon
COMPLETED
2018
CONSTRUCTION COST
$13,668,906.11
PROJECT AREA
22,000 sq. ft.