{"id":2593,"date":"2021-01-25T15:50:48","date_gmt":"2021-01-25T15:50:48","guid":{"rendered":"https:\/\/www.aedisarchitects.com\/brownell-middle-school-campus-safety-copy\/"},"modified":"2022-02-24T01:20:41","modified_gmt":"2022-02-24T01:20:41","slug":"k-12-mass-timber-project","status":"publish","type":"post","link":"https:\/\/www.aedisarchitects.com\/k-12-mass-timber-project\/","title":{"rendered":"K-12 Mass Timber Project"},"content":{"rendered":"

[vc_row full_width=”stretch_row_content_no_spaces” css=”.vc_custom_1611596733684{padding-top: 50px !important;padding-bottom: 50px !important;background-color: #333333 !important;}”][vc_column][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n

K-12 Mass Timber Project – APPROVED!<\/h2>\n

[\/vc_column_text][vc_single_image image=”2658″ img_size=”full” alignment=”center”][vc_column_text]It is with great excitement we share that our first K-12 Mass Timber project has been approved by DSA and will soon be under construction. Prospect High School, in Campbell Union High School District, will soon be transformed with the addition of two, single story buildings and approximately 1.5 acres of site work that will seamlessly connect with the existing campus and add approximately 20,000 SF of indoor and outdoor learning areas.<\/p>\n

The importance of nature and biophilia for student health and wellness was a major focus for this project and the designs truly reflect that commitment. A strong indoor-outdoor connection was woven into the design, and Cross Laminated Timber, a natural, renewable, sustainable, and low carbon footprint material, was used for the roof structure. It creates a warm, pleasant and biophilic space that promotes an increase in student performance as well as boosts the energy level and overall well-being of the occupants. The classroom project is estimated to be completed and ready for the 2022-23 school year.<\/p>\n

Project highlights include:<\/p>\n